2. Governance, authority and accountable procurement

Governance works when it connects a real problem to a responsible person’s decision, the resources needed and a way to follow through.

Connect roles to real decisions

When everyone is responsible, often no one decides when disagreement arises. For each use case, the service owner must be accountable for outcomes and continuity; the data steward addresses access and quality, the technical team implementation and security, and the legal function the limits of authority and obligations. This allocation does not remove the organization’s responsibility to the public. Outsourcing operations does not automatically transfer accountability.Source: [4] [3]

A proposed allocation of decisions, not a mandatory organizational structure
RoleExpected decision or evidence
Service ownerPurpose, acceptance criteria, level of use, and the decision to stop or expand
Data stewardData inventory, access authorization, quality, retention and correction
Technical and security leadsArchitecture, authority controls, testing, monitoring and recovery
HR and legal functionsTask changes, review capacity, effects on people and legal boundaries
Review authorityExamination of complaints and contrary evidence, and correction with appropriate independence

For a critical role, record the named owner and deputy, availability and operational authority. “In coordination with the relevant unit” is insufficient for an incident during a holiday. If the person authorized to stop the service lacks the technical access to do so, their authority exists on paper but not in practice.

Enforce decision gates outside the model

An AI agent1 may search, plan and call tools, but its claim that “I have permission” is not organizational authorization. Authority must be checked in a controllable system: the agent’s identity, operation, destination, data scope and required approval. For a consequential action, the approver must see the specific action and its consequences. A general approval at the beginning of a conversation must not become unlimited permission for later operations.Source: [20] [25]

Design gates around consequences. Viewing a public document, drafting a letter, sending it and modifying a case record are four different levels of action. Separate reading from writing and execution, and set proportionate limits on number, value or scope. Repeated requests also require a clear determination of whether the action has already occurred; a repeated message must not create a duplicate payment or record.

Explain risk in a way that supports a decision

A report of “medium risk” without consequences, evidence and ownership does not support a decision. Specify the scenario: which asset or service might be harmed, through what route and with what possible effect? Which controls are operating now, and what remains unknown? A risk owner2 needs the authority and resources to influence the risk. Naming a specialist who cannot act is not a real transfer of responsibility.Source: [2]

NCSC cautions against turning ordinal labels such as low and medium into supposedly precise measurements by multiplying arbitrary numbers. It is better to estimate downtime, the number of potentially affected cases or correction costs with explicit assumptions and visible uncertainty. Committees should also fit the problem. Responsible AI discusses the value of diverse expertise alongside the risks of conflicts of interest, limited capacity and assessments becoming a formality.Source: [2] [42]

  • Residual risk acceptance: record the owner, rationale, scope and review date.
  • Changes to data, model, target population or tool authority: repeat the relevant assessment.
  • Claimed controls: request evidence that they operate and can be maintained over time.

Assurance3 means gathering and evaluating sufficient evidence for a specific claim. A certificate, completed form or high score alone does not establish that a service is secure and dependable under real conditions.Source: [4]

Begin procurement with acceptance criteria

Write the test cases and acceptance criteria before the supplier’s demonstration. Attractive answers to a few general questions do not show service quality when circulars conflict, scanned text is poor or a case is incomplete. Consider license costs together with integration, review, training, monitoring, model changes and contract exit. Ask the supplier for evidence suited to your data, language and conditions of use.Source: [19] [5]

Proposed areas for contracts and assessment
AreaAn answerable question
DataWhere does data go, what is it used for, and who verifies its deletion or export?
ChangeHow can the model, subprocessor or terms of service change, and what notice and testing are required?
IncidentWhat is reported, to whom and through which channel, and how is investigation supported?
ExitIn what format are data, settings and records transferred, and how is an alternative service started?
AcceptanceWhat test represents real work, and what contractual consequence follows a failure?

The provisions studied from Iran’s Law on Holding Tenders are relevant to quality, evaluation and procurement specifications. The version reviewed is not a basis for stating current financial thresholds, exceptions or all amendments. Each agency’s procurement route must be checked against applicable rules and the view of its responsible authority.Source: [32]

Management reporting should lead to a choice

Do not fill governance meetings with user counts and new features. Bring three matters to the front: service outcomes against the baseline, unresolved risk or exceptions, and the decision required from management. If remediation has not been funded, the report should show the consequences of continuing use and the options for limiting scope.Source: [3]

The UK Government Cyber Action Plan connects accountability, support, shared services, response and skills. The transferable lesson is the connection between resources, responsibility and outcomes. Its institutions, budgets and deadlines are not a ready-made blueprint for Iran. In an Iranian agency, examine separately the shared dependency of several units on one supplier or model: each unit’s own risk acceptance may overlook a simultaneous failure across the chain.Source: [26]

  • Which decision from the previous meeting was implemented, and what was its effect?
  • Which claim still lacks sufficient evidence?
  • What authority, budget or process change is needed today?
  • Who will report the outcome of the decision, and by when?

Footnotes

  1. AI agent AI agent / Agentic AI

    A system that can plan multiple steps and call tools in pursuit of a goal. Its authority must be bounded by execution controls, a defined scope and an identified owner.

    ↩
  2. Risk owner Risk owner

    The person or role accountable for decisions about a risk, with authority and capacity to influence its treatment or acceptance. A title without sufficient resources is not enough.

    ↩
  3. Assurance Assurance

    Evaluation of evidence supporting a specific claim about a system or control. Test boundaries, evidence quality and changing conditions limit the confidence obtained.

    ↩

Author

Danial Samiei

Assistant Professor of Management and researcher in public administration and human resources

Danial Samiei is an assistant professor in a university management department and a member of its public administration group. According to his own account, he has held advisory roles at the National Cyberspace Center and the National Center for Numbering Goods and Services, served as a fund’s CEO, and been a CEO, founder or co-founder of technology companies, alongside managerial responsibilities in the public sector. His formal academic field is human resource management; artificial intelligence, futures studies, neuromarketing and neuroleadership are also areas of his study.

This work presents the author’s independent analysis, not the official position of his university, advisory centers or organizations where he has worked. The professional background described draws on his existing résumé and direct statements as the owner of this work; areas of study are not presented as formal neuroscience qualifications. The educational examples in this collection are not accounts of personal experience or results from a real project.